So, once again, I have no photos of the progress in the basement. I'm too cranky and I'm also trying to keep the batteries charged for the camera - just in case the Little Pumpkin decides to make her appearance!
Enough with the excuses - today . . . we (yes, I actually did some work) worked on both the sewing room and the study . . . Joe put the baseboard down in the sewing room. Yesterday, I had started hauling my treasures into the room . . . . after Mom and I had washed the cupboards out and swept the floor a few times. Now, we'll need to sweep it a few more times and do some more dusting. Then, the only thing left will be to stock it full of scrapbook and sewing stuff!
While Joe was in the sewing room, Dad and Steve resumed installing the studs and insulation in the front room - pretty much, what will become the "study". The electric wiring was also installed. By the end of the day, I'd emptied quite a few boxes into the sewing room - I can't wait to really plow into my unfinished projects! Dad, Joe and Steve had finished the one wall with drywall and have half of the front wall drywalled as well.
Next week, they're hoping to finish the drywall and also start cutting down some of the trees that need gone - I have 5 out front, two on the side and then three or four by the drive that are dead or more dead than alive . . . .
I wonder if I'll be around to keep an eye on them . . . . or will the Little Pumpkin and I be hanging out in the hospital?
We'll see!